Correction: The Pebble Beach gate is closed. Low riding vehicles may exit Diamondhead on Arlington Ave. --> Lift-arm exit.
Board Members
Present:
President Larry Hibbs John Coleman
Vice President Chris Wasson Suzie Combs
Treasurer John Porter Sharon Carr
Secretary Diane Jones Gordon Moore
Jim Ott
Discussion began with the Spike Strips ~
- Spike
strips are measured at 6 inches in height
- Low
riding vehicles could be 4 inches
- Spike
strip must be lowered into the road-way
Lift Arm Gate
President Larry Hibbs expressed his concern regarding the Lift
arm gates.
- The
vehicle code reader must be within a limited distance from the computer
located in the Police Department facility.
- The
Lift-arm gates are installed beyond this required distance.
- The
vehicle code reader is located between these two locations.
- The
vehicle reader was installed to triangulate the Lift-arm gate with the
computer.
- The
distance between the vehicle reader and the Lift-arm gate mandates the
allowed time span for the Lift-arm to remain in the up / open position.
- A
second, third, fourth, etc. vehicle code is read by the reader – enabling
the Lift-arm gate to remain open.
- This
distance allows vehicles following behind / tail gating to pass through
the “open” gate.
- A STOP sign is proposed to alleviate
this tail gating problem.
- This
STOP sign will be located next to the current Speed Bump.
- Additional
Speed Bumps have been deemed necessary to prevent vehicles from speeding
through this designated area between the Police Department facility and
the Lift-arm gates.
President Larry Hibbs and Chief Joel Tyner will be meeting
with Integrated Systems to discuss this issue on Thursday, October 29th.
November Agenda Meeting:
Nov. 12th – 6:30
November
Town Meeting: Nov. 12th – 7:00
November Board Meeting:
Nov. 19th – 7:00
Notes provided by,
Diane Porterfield
620-3167