Board members read this...

The Board Members read this Newsletter. Let them know how you feel about the things they are doing by checking the appropriate response: Do You Approve? Yes!! ( ) Undecided ( ) No!! ( )

10/07/2017

Common Areas Maintenance Committee 10-5-17


Common Area Maintenance Committee 
October 5, 2017


Maintenance Committee Members
Mike Wynn
Jerry Wright – Chairman
Diane Porterfield – Board Liaison



Diane met with Jerry Wright today to discuss the needs for culvert and right-of-way maintenance.  Jerry served as chairman of the Roads Committee for almost 2 years.  He is frustrated with the lack of concern regarding the urgent need for our road ways to be free from water drainage.  

After my discussion with Jerry, I met with Eddie Gilbreath.  Eddie & I drove around Diamondhead to view some of the more desperate areas of water damage to the roads.  Spa Construction and Mark (?) are in the process of repairing many of the holes and edges of the roads.  However, all that repair work will need to be done every year until the ditches are cleared for appropriate water drainage.

Discussion involved the need for:
·         Mow the edge of pavement to the right of way (20 à30 feet)
o   Mow with bush hog first to clear away debris in order to see further needs
§  And to remove small sapling trees before they get any larger
§  Mow 2 times per year = regular maintenance schedule
o   Many areas have trees growing in the ditches that will need to be cut down
o   A back-hoe will need to dig out the accumulated thatch, debris and tree roots.
o   Most of the dead trees that were poisoned by Entergy can be chopped up / pulverized by the bush hog attachment
§  The remaining debris can be burned on an adjacent lot owner’s property with the permission of the owner.  
·         Planning / time management needed
§  This process may take 2-3 years – starting with the most desperate areas

·         Purchase of the needed tractor that will pull the bush hog attachment
o   4-wheel drive
o   With belly pan - allows the blades to slide over the top of stumps.
o   The tractor should be adaptable for trimming low-hanging branches
§  attachment- future purchase.
o   Eddie has pictures and info 
§  Recommends John Deer or Kubota 

·         In-house service vs. contract labor
o   Pros and cons of contract service vs. staff labor was discussed.  A contract bid would need to be obtained for further evaluation.
§  Call County for list of contractors with insurance for bids
o   This [Fall] is the time of year to get started on the project
o   Important to complete each individual project.  An unfinished project will erode, deteriorate before the following year comes around again.
§  Time and funds should be allotted before each project starts.

The issue regarding the need for a full time / paid staff member dedicated to Diamondhead road-ways has been brought before the board in the past. 
           This need is Great and Immediate.

Note:  I understand that this can be viewed as a “Roads Committee” issue.  It is my belief that all our committees should work together for the best interest of Diamondhead.  The Roads Committee has my full support !

Common Area Maintenance Committee
Diane Porterfield, Board Liaison

Blog Archive